CDOT I-70 Slab Jacking

MCSI filled a 4 ” void under a section of I-70 at mile marker 15 in Loma, CO.  CDOT hired us to lift up this section of highway where there was a noticeable belly in both lanes. We pumped in a Cement-Soil Slab Jacking Material until we achieved a almost perfect string line grade and the belly is gone! After the Slab Jacking was complete MCSI filled in voids and installed new caulking in failed joints.